I mean, if they want to include the power generation for said data center then sure, go for it. They should build them like that steel mills of old. Their own power, their own water plants etc. EVERYTHING it needs should be part of the build out so as not to rape the existing infrastructure.
I mean, if they want to include the power generation for said data center then sure, go for it. They should build them like that steel mills of old. Their own power, their own water plants etc. EVERYTHING it needs should be part of the build out so as not to rape the existing infrastructure.
That’s not how it works with these leeches. ; funded by the taxes hard working White men pay, as usual.
That’s not how it works with these leeches. [They want the US to build more power generation for them](https://www.tomshardware.com/tech-industry/artificial-intelligence/openai-calls-on-u-s-to-build-100-gigawatts-of-additional-power-generating-capacity-per-year-says-electricity-is-a-strategic-asset-in-ai-race-against-china); funded by the taxes hard working White men pay, as usual.
Well fuck them.
Well fuck them.