This needs to stop.

[direct link](https://www.tomshardware.com/tech-industry/artificial-intelligence/nvidia-announces-reference-design-for-gargantuan-gigawatt-scale-omniverse-dsx-data-centers-single-data-center-requires-a-nuclear-reactors-worth-of-power-generation) This needs to stop.
[–] 1 pt

I’m good with this. Likely they will build those nukes on the 1970 timeline for 10-14months not the 1977 epa timeline for 7 years.

And when this ai shit all crumbles we will have hundreds of nukes, and cheap if not free power.

Bring that shit.

[–] 1 pt

I mean, if they want to include the power generation for said data center then sure, go for it. They should build them like that steel mills of old. Their own power, their own water plants etc. EVERYTHING it needs should be part of the build out so as not to rape the existing infrastructure.

[–] 1 pt

That’s not how it works with these leeches. ; funded by the taxes hard working White men pay, as usual.

[–] 0 pt

why dont they just put windmills or solar panels on the roof of the data centers?