That looks like the start of a nightmare job.
That looks like the start of a nightmare job.
If all goes well, this was the most delicate and messy part of it. The hole is already large enough to accommodate all the cables from the inverter to the power switching box which is going to sit next to the main fuse box. The next holes I'm sure I can just drill. No cables in the wall there. It's going to be covered up with cable ducting and maybe some gypsum at the edges.
Hope to get this done before Christmas.
If all goes well, this was the most delicate and messy part of it. The hole is already large enough to accommodate all the cables from the inverter to the power switching box which is going to sit next to the main fuse box.
The next holes I'm sure I can just drill. No cables in the wall there.
It's going to be covered up with cable ducting and maybe some gypsum at the edges.
Hope to get this done before Christmas.