WelcomeUser Guide
ToSPrivacyCanary
DonateBugsLicense

©2025 Poal.co

(post is archived)

[–] 3 pts

"These columns are getting in the way of the parking spaces - cut them. No problem for 50,000 lbs of water to be cantilevered on 2 x 6s."

[–] 2 pts

Would have been fine if it wasn't full of water

[–] 2 pts

I guess they did not spend a Brazilian dollars

[–] 2 pts

6 Brazilian actually, but that’s like $42.50 American though.

Still, I assume they’re suing Germany for pool reparations.

[–] 2 pts

6 gorillion Brazilian

kek

[–] 2 pts

More niggers from Africa were shipped to Brazil by the kikes than anywhere else in the new world.

[–] 2 pts

Stupid brown people trying to do White people shit, having a pool above floors. They should stick to hearding buffalo or picking lettuce.

[–] 3 pts

Cargo cultism. Copy the appearances without understanding the principles.

[–] 1 pt

They cheap out on the cement and re bar,dumb fucks

Engineering 101: Water is heavy as fuck.

[–] 0 pt

It's lighter than steel and concrete and dirt.

[–] 1 pt

Filling an empty space with water can make up for the difference.

[–] 0 pt

Brazilian 'engineering': wow!

[–] 0 pt

Bad engineering, cheap materials and poor workmanship.

[–] 0 pt

At least they had the good sense to put it above the parking garage and not over any cars. But seriously... I bet they only accounted for the weight of a floor and not a full pool of heavy water.

Load more (1 reply)