I engage ai on this shit. “So if all the pole ice melted, how much would the water rise?” 200-250ft.
If the poles shifted and the magnetic draw moved water around what’s the likely highest leve it would rise in relation to current zero/sea level. 200-300 ft.
With or without ice melt?
Without as we wouldn’t know where the shift is and if melt would occur.
But if it did we are looking at ~500ft max rise? Yeah.
Would that peak and recede since at some point after movement the cold parts (new poles) would freeze again? Yes unless they happened to be mountains which is not probable, as there is more ocean than mountains.
Ok then climate, I’m in Texas at elevations over 500 ft. (Lots of Texas is, fuck Houston and the browns down south) whey extremes we looking at? The earth shift could be 0,22,35,60,90 those are the most probable shift points, Based on that what’s the temps.
Worst of the 5, 80-120 degrees yearly. Ok that’s Texas almost now. Sans the 120, but we see 105-110 some. So 1 in 5 chance it would be the far extreme.
Me: can you survive this if you lived underground? Yes. If you can still get water. Underground is the easiest way to do this.
Me: my metal bulosng has xx by xx steel beams with purlins x on center, what’s the load capacity? Ai: not enough to cover it with 3 ft of dirt.
Me: ok how would I do it disregard the roof for now? Water proof membrane. Like solid I had an unlimited supply of say billboard material would that work? Yes that’s perfect.
Build French drains prism the 3 high sides of the house, rock and perforated pipe, wrap house in billboards, Back fill with #4-6 rock. If have used metal roof cover that. Then cover roof.
Me: if I built an interior support system of beam and 4x4 posted, 5ft on center, with center supports, and beam cross braces in between the existing purlins could it hold 3 ft of dirt?
3/8” wall 4x4 post with 10” I ran could hold 8-10 ft of dirt.
So if I had enough time to build this inside my barn, I could make this work?
Yes if you had time.
In a pole shift how long before the temps change for the extreme? Pole shift would likely take 2-4 years even on a fast scale, it won’t flip overnight.
Me: how many welding rods do I need for this venture?