They expand load but refuse new baseload supply. Nuclear is a must if the grid is to survive. "Green" at grid level must be limited or removed.
> Nuclear is a must if the grid is to survive.
That's bullshit. We have plenty of oil and gas to generate electricity.
America has 1000+ years of coal available to drive power plants.
(post is archived)