Building base fer hospital building. Current pit 400 holes in 40 hrs. Galvinized pipe driven in ground. Cap has 4 @ 1 ¾ holes to be filled and almost all holes were partially visible tough job in 80 desert heat

Building base fer hospital building. Current pit 400 holes in 40 hrs. Galvinized pipe driven in ground. Cap has 4 @ 1 ¾ holes to be filled and almost all holes were partially visible tough job in 80 desert heat

(post is archived)

What's the point of driving all of the pipes into the ground? The equivalent of steel pylons?

[–] 1 pt

yes they will get support columns welded on then concreted into the ground. about 4 foot of concrete solid chunk with alot and i mean alot of rebar. there was 140 support pads in there but 96 got welded.