What's the point of driving all of the pipes into the ground? The equivalent of steel pylons?
yes they will get support columns welded on then concreted into the ground. about 4 foot of concrete solid chunk with alot and i mean alot of rebar. there was 140 support pads in there but 96 got welded.
(post is archived)