WelcomeUser Guide
ToSPrivacyCanary
DonateBugsLicense

©2024 Poal.co

642

We cheated because we only replaced the walking surface, but it looks so much better. Some areas might've fallen through when walking if we were a subject of FPH. I found a lot of 2x6x8-14 for about $.20/linear foot. Had to pick through a lot of knotted, broken, or termite ridden boards to get what we used, and had to piece out a few runs, but it saved a couple thousand dollars. Right now the 2x6x12's are going for $20 each, plus tax. It's kinda crazy how expensive it is to pay someone to do something like this and it's so easy. This has been my sentiment about everything, though. Why pay when you can do it? If you have to slave away for the jew(to get money to pay for services) or yourself, you should always do it for yourself.

We cheated because we only replaced the walking surface, but it looks so much better. Some areas might've fallen through when walking if we were a subject of FPH. I found a lot of 2x6x8-14 for about $.20/linear foot. Had to pick through a lot of knotted, broken, or termite ridden boards to get what we used, and had to piece out a few runs, but it saved a couple thousand dollars. Right now the 2x6x12's are going for $20 each, plus tax. It's kinda crazy how expensive it is to pay someone to do something like this and it's so easy. This has been my sentiment about everything, though. Why pay when you can do it? If you have to slave away for the jew(to get money to pay for services) or yourself, you should always do it for yourself.

(post is archived)

[–] 0 pt

Seriously thank you for telling me. I'm probably looking at doing this on the new house, and I wouldn't have known. Usually I'll read everything I can find before tackling a project but all of this has been so sudden. We had an agent call and beg us to list, and the same night as his call we found this deal on the wood. The very next morning we're banging out the boards.

[–] 1 pt

We're the exact same way and read everything we could too lol

We were sure we left enough space for expansion and contraction and for dirt to fall through but by the 3rd rainstorm we realized we had not :( it was so discouraging and totally deflated us... We were SO PROUD of that deck lol!

[–] 0 pt

What did you end up doing? I could see myself out there shaving 1/8" off one side of the board with a fucking jig saw lol.

[–] 1 pt

We actually considered that! (But not with a jigsaw, but by running a circular saw adjusted to 1.5" depth along the lines so we could avoid unscrewing the whole thing, but after a few attempts it was clear that was going to take even longer than doing it the right way).

We ended up removing and respacing the two spots where the pooling was the worst, (thankfully near the two ends) but on the rest of the deck (and this is really embarrassing and not at all the correct way to deal with it!) I just got out the fattest drill bit I had and went down the line drilling a drainage hole between the studs every 2' or so making sure I didn't hit a joist underneath and then I flushed out the wood shavings so they wouldn't make the problem worse when they swelled up and I covered it with an indoor/outdoor rug lol.

Like I said, we weren't pros either, but anyone can definitely learn from our mistakes :)