2 weeks. That's my guess of the earliest possible date. Those trucks are running 24/7 as soon as one is charged its put into drive. The more they load, the harder the battery is drained.
2 weeks. That's my guess of the earliest possible date. Those trucks are running 24/7 as soon as one is charged its put into drive. The more they load, the harder the battery is drained.
i hate to dump on niggers who are actually working, but we still need to factor in the nigger operator factor, and the toll it will take on these dubiously-constructed trucks. also, its just a matter of time before the nigger collective figures out the lithium batteries on these trucks are so large that they will burn down an entire city block when exposed to water.
i hate to dump on niggers who are actually working, but we still need to factor in the nigger operator factor, and the toll it will take on these dubiously-constructed trucks. also, its just a matter of time before the nigger collective figures out the lithium batteries on these trucks are so large that they will burn down an entire city block when exposed to water.
(post is archived)