That's a whole lot of "Go and fuck yourselves".
Archive: https://archive.today/KVXPJ
From the post:
>A massive data center and power generation complex is being proposed for 5,344 acres of ranchland northeast of Wheatland in Platte County near the Goshen County line, on property owned by the Lazy V Six Ranch.
The developer, a company called Site Layer 4, has filed an application to rezone the land from agricultural to industrial for what it describes as a $26 billion data center campus with co-located, utility-scale energy generation. The property is roughly 13 miles east of Interstate 25, in an area now used for grazing and agriculture.
Public hearings for the rezoning have been set for 7 p.m. Aug. 11 before the Platte County Planning and Zoning Commission and 10 a.m. Aug. 20 before the Platte County Commission.
Site Layer 4 says in its application that the project would be built over multiple years and is designed to concentrate infrastructure in one unified location.
That's a whole lot of "Go and fuck yourselves".
Archive: https://archive.today/KVXPJ
From the post:
>>A massive data center and power generation complex is being proposed for 5,344 acres of ranchland northeast of Wheatland in Platte County near the Goshen County line, on property owned by the Lazy V Six Ranch.
The developer, a company called Site Layer 4, has filed an application to rezone the land from agricultural to industrial for what it describes as a $26 billion data center campus with co-located, utility-scale energy generation. The property is roughly 13 miles east of Interstate 25, in an area now used for grazing and agriculture.
Public hearings for the rezoning have been set for 7 p.m. Aug. 11 before the Platte County Planning and Zoning Commission and 10 a.m. Aug. 20 before the Platte County Commission.
Site Layer 4 says in its application that the project would be built over multiple years and is designed to concentrate infrastructure in one unified location.