WelcomeUser Guide
ToSPrivacyCanary
DonateBugsLicense

©2025 Poal.co

1.3K

(post is archived)

[–] 1 pt

And it was shut down because of Chinesium pipes/tubing. The metal delivered wasn't nearly up to the task and corroded. SCE determined it would be cheaper to shut the plant down than reorder and install the correct pipes/tubing.

[–] 0 pt

I didn't see that information, I was led to believe it was shut down due to environmental wackos, but regardless it is a huge loss of energy production.