12000 a day. Hurray, lets math. Hypothesis 10 crematoriums. Capable of turning a body in 2.5 hours with .5 for changeover. That makes 8 each unit per 24 hours. For a total of 80 a day.
OK, we have a base line. Lets say, two hours to completely remove the body. 12 bodies per unit, 120 per day. NO NO NO NO, that wont work. we are 100% off.
40 Crematoriums. Banks of ten, two rows, two sides. 480 a day. Still a long, long way off. Hmmmm.
1000 Crematorium stations, 2 hours to remove, 24 hours. YEP 12,000 bodies per day. Sounds logical.
I ain't one to say it's impossible, imagine the energy usage? The trees surrounding the place would have been clear cut for just one day of burning the bodies.
(post is archived)