What's this, a memorized checklist?
That's exactly what it is. Pre-landing checklist.
Although ideally all of those things are already completed. Hence why they're checklists, not do-lists.
No manufacture uses the term do-list in their literature, even if read-and-do is in their checklist protocol. Not that manufactures are good with terms, e.g. the auto throttle system moves the trust levers that are definitely thrust levers not throttles. Flows, checklists. Is that technique or procedure? Did you just VVM (verbalize, verify, monitor) when you said 3000 set, or is that a specific procedure so it doesn't count as VVM. OMG man, do you even know what you're doing in here? I'll refer you to chapter 3 normal operations. Maybe you should read that. Hey, good trip. Let's do it again. Good luck getting home.
(post is archived)