WelcomeUser Guide
ToSPrivacyCanary
DonateBugsLicense

©2025 Poal.co

Crappy geotechnical engineering. If the ground was that unstable, it should have been bridged too or the bridge site moved

Crappy geotechnical engineering. If the ground was that unstable, it should have been bridged too or the bridge site moved
[–] 0 pt

Chinks all scam and skim, even off of each other. I would be surprised if the construction crews weren't selling material and replacing it with even cheaper material.