WelcomeUser Guide
ToSPrivacyCanary
DonateBugsLicense

©2025 Poal.co

Crappy geotechnical engineering. If the ground was that unstable, it should have been bridged too or the bridge site moved

Crappy geotechnical engineering. If the ground was that unstable, it should have been bridged too or the bridge site moved
[–] 1 pt

TL;DR - built on an unstable rock face. Landslide took it out. Chink materials, minimal amount of money spent, and workers smoking 50 packs of cigarettes a day didn't help either.

[–] 0 pt (edited )

Chink made materials, chink engineering and chink construction caused this.

[+] [deleted] 0 pt