Sounds like some retard installed a 120V charger for his Tesla. If he had hired a competent electrician they would have installed a 50A 240V Level 2 charger and adding 10% would take 28 minutes.
Sounds like some retard installed a 120V charger for his Tesla. If he had hired a competent electrician they would have installed a 50A 240V Level 2 charger and adding 10% would take 28 minutes.
Yep. It was an unprofessional installation.
Yep. It was an unprofessional installation.
umm 23 year electrician and I did install a 50 amp 240v Level 2 and the fucking Kia still said that. but thanks for being a faggot.
umm 23 year electrician and I did install a 50 amp 240v Level 2 and the fucking Kia still said that. but thanks for being a faggot.
If you knew what you were doing you would know that 2.5 hours of 50A at 240V is 30 kWh and that the car didn't have a 300 kWh battery.
If you knew what you were doing you would know that 2.5 hours of 50A at 240V is 30 kWh and that the car didn't have a 300 kWh battery.
i was telling what the car said fag. move on.
i was telling what the car said fag. move on.
(post is archived)