WelcomeUser Guide
ToSPrivacyCanary
DonateBugsLicense

©2025 Poal.co

661

(post is archived)

[–] 0 pt

This was planned since 2001, when the turbines were erected.

Last week, one of the total of eight turbines had been dismantled. When the wind turbines went into operation in 2001, it was already clear that open pit mining would come one day, the spokesman explained. The dismantling should be oriented to the progress of the open pit mining.

German source: https://www.zdf.de/nachrichten/wirtschaft/windraeder-abbau-garzweiler-rwe-100.html

[–] 0 pt

Sounds like something out of 1984