WelcomeUser Guide
ToSPrivacyCanary
DonateBugsLicense

©2025 Poal.co

1.2K

The onshore drill site is 450m outside the park, but the bore extends 3.5km out into the ocean, including a 1.3km stretch passing underneath the national park.

The onshore drill site is 450m outside the park, but the bore extends 3.5km out into the ocean, including a 1.3km stretch passing underneath the national park.

(post is archived)

[–] 0 pt

Sad that we are losing these landmarks, but erosion is a bitch. I'm sure there's some other beach on the other side that's grown instead.