The onshore drill site is 450m outside the park, but the bore extends 3.5km out into the ocean, including a 1.3km stretch passing underneath the national park.
The onshore drill site is 450m outside the park, but the bore extends 3.5km out into the ocean, including a 1.3km stretch passing underneath the national park.
(post is archived)