The rest (windows, doors, plumbing, wiring, flooring , etc) still need to be installed after the 3D shell is made/cured.
The rest (windows, doors, plumbing, wiring, flooring , etc) still need to be installed after the 3D shell is made/cured.
The rest (windows, doors, plumbing, wiring, flooring , etc) still need to be installed after the 3D shell is made/cured.
(post is archived)